Resumen:
Electromagnetic (EM) disturbances and compatibility issues are the most common problems affecting communication and signaling systems. The duration of field testing to solve these railway EM interference (EMI) problems may vary between three and 12 months, with the cost of the complete process between & euro;25,000 and & euro;1.5 million [1]. Currently, the railway industry demands the building of strategies and tools to promote paths toward zero on-site testing [2] and reduce the duration of field tests; however, there is a lack of laboratory testing resources for these approaches.